A hotel runs four floor environments — lobby, kitchen, back-of-house, parking — each with its own spec and its own zero-tolerance for downtime. The right contractor zones the building, phases the install around the operation, and never closes a guest-facing area.
Three engineered options. Final selection drives off your substrate, use and decorative goal.
Substrate, environment, downtime — every spec gets evaluated before product is selected.
Lobby, kitchen, BOH and parking each spec'd independently. Documented transitions at threshold.
Front-of-house work runs nights with HEPA, light containment, and barriers — guests don't see the install.
Urethane cement installs Friday night, cures over weekend, opens Monday — single weekend kitchen turnaround.
Polyaspartic re-coats with 24-hour return-to-service for staff corridors and storage.
Lobby metallic and polished pigments tunable to hotel brand spec where required.
Low-VOC and zero-VOC chemistry for occupied front-of-house. Coordinated with HVAC.
Phased per zone. Lobby 3–5 nights, kitchen 1 weekend, BOH corridors 24-hr cycle, parking phased nights.
$5–$18/sq ft depending on zone. Polishing low end; metallic lobby and urethane kitchen at the high end.
Final spec quoted on-site after substrate evaluation.