
Warehouse flooring is forklift infrastructure — point-load rated, slip-resistant wet, OSHA traffic-lane striped, and installed phased so the warehouse never goes dark. The right system pays back in ten years of zero re-coat.
Three engineered options. Final selection drives off your substrate, use and decorative goal.
Warehouse flagship. 100% solids, 30–40 mil, OSHA striping in-coating.
Fast-turnaround re-coat. 24-hr return to service. UV-stable for daylit zones.
Pick-pack and light-industrial zones. Low-maintenance, no re-coat.
Substrate, environment, downtime — every spec gets evaluated before product is selected.
Compressive strength rated for actual forklift PSI. 9,000+ PSI for rubber wheels; 12,000+ for steel-wheel pallet jacks.
Striping installed in-coating, not painted on after. Won't wear off under pallet drag and forklift traffic.
Battery charging, cleaning chemical storage and forklift maintenance bays spec'd separately from general warehouse.
Active warehouse stays operational. Aisle-by-aisle phased install. Polyaspartic 24-hr re-coats for tight windows.
Phased aisle-by-aisle. Typical 50,000 sf warehouse: 3–6 weeks phased nights/weekends. Polyaspartic re-coats 24 hr.
$5–$11/sq ft installed. Solid epoxy mid-range; polishing at the low end; polyaspartic premium.
Final spec quoted on-site after substrate evaluation.
Last updated: April 2026
Reply within two business hours. On-site consult, written specification, and itemized quote — never a high-pressure sales visit.
(619) 304-6501