
Base facilities, hangars and maintenance buildings live under their own spec book — federal labor compliance, security clearance, fast-turnaround installs around mission schedules, and a closeout file the COR will sign..
Three engineered options. Final selection drives off your substrate, use and decorative goal.
Hangars, maintenance buildings, motor pools. OSHA striping in-coating.
Fast-turnaround for tight mission install windows. 24-hr return to service.
Base kitchens, mess halls, aggressive wash-down zones.
Substrate, environment, downtime — every spec gets evaluated before product is selected.
Davis-Bacon prevailing wage, certified payroll, EEO compliance — all built into project workflow.
Crews and equipment coordinated through base security. Clearance lead time built into schedule.
Install lands inside the published mission window. Backward-scheduled from go-live with crew sized accordingly.
Aircraft point loads, tow bar traffic, JP-5/JP-8 spillage — solid epoxy with chemical-resistant top coat.
Traffic and equipment striping installed in-coating, OSHA-spec, won't wear off.
COR-ready file: spec compliance, install photos, manufacturer warranty, slip rating, certified payroll.
Per mission window. Hangar install: 5–10 nights phased. Maintenance building: 3–5 nights.
Per published spec — federal labor rates apply. Material and prep at spec'd quality.
Final spec quoted on-site after substrate evaluation.
Last updated: April 2026
Reply within two business hours. On-site consult, written specification, and itemized quote — never a high-pressure sales visit.
(619) 304-6501