
Manufacturing flooring — food, beverage, pharma, electronics — is process-critical infrastructure. The spec is set by the use environment: USDA/FDA in food and pharma, ESD in electronics, ANSI A326.3 DCOF in everything wet — and the install has to land inside a planned shutdown window.
Three engineered options. Final selection drives off your substrate, use and decorative goal.
Substrate, environment, downtime — every spec gets evaluated before product is selected.
USDA/FDA, GMP, FSMA — system spec'd to the actual audit standard, documented in closeout file.
Sanitizers, caustic wash, hot oil, organic solvents — chemistry chosen against actual daily exposure.
Where required (electronics, flammable handling), ESD or conductive systems to ANSI/ESD S20.20.
Install lands inside the planned annual or quarterly shutdown. Schedule built backward from go-live.
Datasheets, install photos, warranty, slip-rating test, audit-ready file at completion.
Per shutdown window. Urethane cement: 3–5 day install. Quartz: 4–6 day install. Phased zones for occupied facilities.
$10–$22/sq ft installed. Quartz at the low-mid; urethane cement and ESD systems at the high end.
Final spec quoted on-site after substrate evaluation.
Last updated: April 2026
Reply within two business hours. On-site consult, written specification, and itemized quote — never a high-pressure sales visit.
(619) 304-6501